PROJECT COLLECTION

Barchester Wimbledon Beaumont

The relationship continues to Blossom with Barchester health care

We have just completed works, just in time for the Xmas break at Beaumont Wimbledon Care Home. 400m2 of mastic asphalt surface preparation including scarifying works. 


Signature felt range AA Cap sheet and 20 year underlay. Code 4 lead break flashing to leading drip edge.


We are all looking forward to further our relationship with Barchester in 2022.’

after

CONTACT OUR TEAM

Contact Us

Share by: